PROJECTS
COMERCIAL INDUSTRIAL AND RESIDENTIAL
BUILDINGS
SCHOOLS:
Name of Project: FERNDAL HIGH SCHOOL
Square Footage: 400,000 SQFT
Description of Scope of Work Performed:new Gymnasium,
music rooms, office area,
Mechanical room – replace three boilers
(900 MBH each) two water heaters-
(990MBH each) added poster pumps and
replaces existing heating
ventilation units in all classrooms, also in
computer rooms and renovated all
Laboratories in school
Location of project: Detroit, Michigan USA
Name of Project: WAYNE MEMORIAL HIGH SCHOOL
Square Footage: 56,000 SQFT
Description of Scope of Work Performed: new
Gymnasium, replaced rooftop units (hot
water for heating) for existing gymnasium,
locker rooms and replaced water heater for school
Location of project: Wayne County, Michigan USA
Name of Project: WALLED LAKE CONSOLIDATED
SCHOOL DISTRICT
Square Footage: 75,000 SQFT
Description of Scope of Work Performed: Replaced two
boilers, extended office area, classrooms,
auditorium, and unit ventilation for dormitories
Location of project: Walled Lake County, Michigan USA
Name of Project: HICKORY WOOD ELEMENTARY
SCHOOL
Square Footage: 100,000 SQFT
Description of Scope of Work Performed: Replaced two
chillers 85 & 100 ton.
Location of project: Detroit, Michigan USA
Name of Project: UNIVERSITY OF MICHIGAN
DEARBORN CAMP Engineering Building
Square Footage: 90,000 SQFT
Description of Scope of Work Performed: Replaced two
rooftop units weighing 25 tons each.
Location of project: Dearborn, Michigan USA
Name of Project: FORDSON HIGH SCHOOL DEARBORN
Square Footage: 4,000 SQFT
Description of Scope of Work Performed: Replaced rooftop
unit, and made extensive renovations
Location of project: Dearborn, Michigan USA
Name of Project: WATERLOO, CALEDONIA East
Cleveland SCHOOLS
Square Footage: 40,000 SQFT
Description of Scope of Work Performed: Designed HVAC,
and plumbing
Location of project: YOUNGSTOWN, OHIO, USA
Name of Project: APS ALTO PLOTO COLLAGE
NGINEERING/ SCIENCE BUILDING “"P"”
Square Footage: 15,000 SQFT
Description of Scope of Work Performed: Designed
HVAC, plumbing systems
Location of project: San Antonio (SA), TX USA
Name of Project: OUR LADY OF THE LAKE
UNIVERSITY (OLLU) MAIN BUILDING
Square Footage: 75,000 SQFT
Description of Scope of Work Performed: Renovation with
new HVAC systems, chilled water for cooling,
electric for heating and fan power VAV boxes.
Location of project: San Antonio (SA), TX USA
LIBRARY:
Name of Project: STONE OAK BRANCH LIBRARY
Square Footage: 13,000 SQFT
Description of Scope of Work Performed: Designed HVAC,
using an Air Cooled Chiller for cooling and electric heater
for heating and fan power VAV box system for air
distrebution and Plumbing system..
Location of project: San Antonio, Texas USA
POST OFFICES:
Name of Project: MANY POST OFFICES as LA ROUGE
POST OFFICE
Square Footage: 10,000 SQFT
Description of Scope of Work Performed: Design HVAC
and Plumbing systems
Location of project: Michigan USA
MALLS:
Name of Project: EL RAIA MALL OVERSEAS PROJECT
Square Footage: 1,800,000 SQFT X three floors
Description of Scope of Work Performed: Design HVAC
(cooling and ventilation), Plumbing and Fire Protection
systems for three floor mall (13500 ton
Location of project: Kuwait state Middle East
Name of Project: K-MART STORE
Square Footage: 40,000 SQFT
Description of Scope of Work Performed: Design HVAC,
and Plumbing systems.
Location of project: Seven Mile Road, Detroit, Michigan
U.S.A.
BANKS:
Name of Project: CREDIT UNION BANK.
Square Footage: 4,000 SQFT
Description of Scope of Work Performed: Design HVAC,
Plumbing systems
Location of project: Dearborn, Michigan USA
MEDICAL / HOSPITALS:
Name of Project: DOUGALL MEDICAL CENTRE
Two floors and Basement
Square Footage: 14,000 SQFT
Description of Scope of Work Performed Designed HVAC
and Plumbing systems using rooftop units
Location of project: Windsor, Ontario CANADA
Name of Project: LEAMINGTON DISTRICT MOMORIAL
HOSPITAL
Square Footage: 60,000 SQFT
Description of Scope of Work Performed: Replace two
boilers (150 BHP & 75BHP)
Location of project: Leamington, Ontario, CANADA
Name of Project: PARKE DAVIS BUILDING
(PHARMACEUTICAL MANUFACTURER)
Square Footage: 60,000 SQFT
Description of Scope of Work Performed: Designed HVAC
systems for six floors
Location of project: Holland, Michigan USA
INDUSTRIAL:
Name of Project: DAIMLER CHRYSLER EAST
JEFFERSON FACILITY
Square Footage: 40,000 SQFT
Description of Scope of Work Performed: Design
extension of Truck Docks Door Heaters, HVAC
Location of project: Detroit, Michigan U.S.A.
Name of Project: DETROIT METROPOLITAN WAYNE
COUNTY AIRPORT AND MIDFIELD TERMINAL
BUILDING Description of Scope of Work Performed: Reviewed
design HVAC, and Plumbing drawings
Location of project: Detroit, Michigan USA
Name of Project: WYANDOTTE WASTE WATER
TREATMENT PLANT.
Description of Scope of Work Performed: Designed
HVAC, Plumbing systems, and pipelines for
polymer injection systems
Location of project: Wyandotte, Michigan USA
Name of Project: DETROIT WASTE WATER PLANT
Description of Scope of Work Performed: Designing HVAC
system & Plumbing Rehabilitate Pump Station No. 1
& No. 2, Polymer Utilization Bldg. Witnessed
performance testing for mixing vertical flow turbine
pumps for Peerless pump manufacturer (Pickle
Liquor Bldgs, Main Plan Bldg ) in Indianapolis,
Indiana (35,000 GPM, 26 ft dynamic head & 300 HP).
Location of project: Detroit, Michigan USA
OFFICE BUILDINGS:
Name of Project: FORMOSA BUILDINGS in West
Hollywood
Square Footage: The project contains the following:
Formosa South building is 6 floors office
building (150,000 sq. ft).
Formosa north building is 6 floors office
building (150,000 sq. ft).
Plaza building is 4 floors office building
(95,000 sq. ft).
Santa Monica building is 4 floors office
building (95,000 sq. ft).
Description of Scope of Work Performed Designed HVAC
systems, buildings use chiller for cooling.
Location of project: Los Angeles, California USA
Name of Project: HOLLYWOOD STUDIO OFFICES
BUILDINGS,
Square Footage: the project contains the following:
two buildings North (168,000 sq. ft)
and South (90,000sq.ft)
Description of Scope of Work Performed: Designed HVAC
systems, buildings use DX system
(Turbocor compressors); Energy
Labs custom made units,
Direct/Indirect Evaporative Cooler,
evaporative condenser, closed
circuit cooling tower and hot water
for heating.
Location of project: Los Angeles, California USA
Name of Project: NOHO III OFFICES BUILDING,
Square Footage: The project contains nine floors
building (170,000 sq. ft)
Description of Scope of Work Performed: Designed HVAC
systems, buildings use DX system (Turbocor
compressors); Energy Labs custom made
units, Direct/Indirect Evaporative Cooler,
vaporative condenser, closed circuit cooling
tower and hot water for heating.
Location of project: Los Angeles, California USA
Name of Project: CPS SECURITY BUILDING.
Square Footage: 13,000 SQFT
Description of Scope of Work Performed: Designed HVAC,
plumbing systems
Location of project: San Antonio (SA), TX USA
Name of Project: PORT AUTHORITY
Description of Scope of Work Performed: Replaced air
cooled chiller (160 ton)
Location of project: San Antonio (SA), TX USA
CHURCHES:
Name of Project: ST MARY AND ST MOSES
ORTHODOX CHURCH
Square Footage: 40,000 SQFT
Description of Scope of Work Performed: Designed HVAC
systems, using steam for radiation heating for
renovation and heating hot water and air handling
and air cooled chiller for cooling for main church.
Location of project: Windsor, Ontario CANADA
Name of Project: HARROW BAPTIST church
Square Footage: 26,000 SQFT
Description of Scope of Work Performed: Designed HVAC
and Plumbing systems for addition
Location of project: Windsor, Ontario CANADA
HOTEL / MOTEL:
Name of Project: RENOVATION KINGSVILLE HOTEL
Square Footage: 16,000 SQFT
Description of Scope of Work Performed: Designed HVAC
and Plumbing systems for renovation
MANY PROJECTS IN SAN DIEGO, and Los Angeles California USA as followings:
• FIRE STATION PROJECTS (# 22)
• KB HOME MANDERILLA, FILLMORE AND
CASCADE PROJECTS (more than 300 units).
• EL CENTRO HOSPITAL (EXTENSION)
• CHURCH & HEAVEN TOWN HOMES RANCHO
CUCAMONGA (KB HOMES)
• SAN DIEGO UNIVERSITY CRAWFORD PHASE II
• TERMINAL 1 AIRPORT (SAN DIEGO) RESTROOM
• SAN DIEGO FAMILY HOUSING
• LIGHT OF LOVE CHURCH
• SALTON SEA RESIDENCES